Case Studies

  • 13 Projects tagged:
  • 'decontamination'
  • Clear Filter
  • Page 1 of 2

Chrisp Street Dental Centre

Dental practice relocation in London with fit-out of 3 surgeries, decontamination room, reception and waiting area. Read →

04 Dec, 2018

Kent Smile Studio Chatham

We were chosen to fit-out and equip the three surgeries, LDU and plant room within this complete practice renovation. Read →

24 Apr, 2018

Kent Smile Studio Maidstone

Decontamination room design and fit-out. Read →

24 Apr, 2018

Sonria Dental Clinic

Refurbishments included:- Heka Dental replacement chair, glass partitions, new flooring and complete fit-out of decontamination area. Read →

24 Apr, 2018

The Lindens Dental Practice, Orpington

Decontamination room design and build with before and after images. Read →

10 Apr, 2018

Figges Marsh Dental Practice

Major practice refurbishment with extension. New equipment installed with dental chairs and light fittings. Read →

05 Dec, 2017

White Oak Dental Practice

Two surgery refurbishments and a decontamination room. Each room was completed as a separate project. Read →

07 Nov, 2017

Norfolk Square Dental Practice

Dental practice fit-out for two surgeries. Turn-key refurbishment with supply and installation of two dental chairs and separate decontamination area. Read →

10 Oct, 2017

Wembley High Street Dental Surgery

Updated dental surgery fit-out incorporating a separate decontamination area. Read →

19 Sep, 2017

Hillcross Dental Practice

Our Decontamination cabinetry range meets all requirements set out in the HTM 01-05 guidelines and are manufactured to allow for all necessary equipment. Read →

18 Jan, 2017

Learn how we can help with your project...

Request Consultation