Refurbishment of Oral and Maxillo Facial Minor Operations unit including a Dental Chair with High Patient Weight capacity.
Before
After
This project was a recommendation from the Hospital’s Orthodontic Polyclinic department. We re-designed the polyclinic: Mechanical, Electrical works, flooring and decorating was carried out by our in-house team. The department required a stand alone multichair dental suite supplied and installed within 12 weeks.
The hospital then needed a full refurbishment of the Oral and Maxillo Facial Minor Operations unit, including a dental chair with a high patient weight capacity.