Case Studies

  • 50 Projects
  • Page 4 of 5

Ashford & St Peters Hospital NHS Trust

Equipment supply and installation as well as the electrical and plumbing works. Read →

10 May, 2017

Hillingdon Hospital NHS Foundation Trust

2 new treatment centres for the Oral & Maxillo-Facial surgeries. Read →

05 Apr, 2017

The Lodge Dental Practice

Refurbishment of basement dental surgery with a new Tridac treatment centre, cabinetry and solid worktops. Read →

18 Jan, 2017

Providence Dental, Folkestone

Dental Surgery Refurbishment in Folkestone with Heka UnicLine Chair package installed. Read →

18 Jan, 2017

AA Tikare and Associates

Our team of design consultants made the best use of space and designed the layout to include two additional surgeries in the basement. Read →

18 Jan, 2017

Maxted Meaden Dental Practice

A refurbishment solution for their Hygienist surgery following damage from a water leak at the practice. Read →

18 Jan, 2017

M.S Darr and Associates

Our design team was able to create space by moving rooms around in the practice. Read →

18 Jan, 2017

Castle Street Dental

Stunning new dental surgery fit-out with quality high specification dental equipment supplied by Heka. Read →

18 Jan, 2017

Hillcross Dental Practice

Our Decontamination cabinetry range meets all requirements set out in the HTM 01-05 guidelines and are manufactured to allow for all necessary equipment. Read →

18 Jan, 2017

Westland Medical Centre

Independent medical centre designed and built by a group of consultants, providing high quality multidisciplinary care. Read →

18 Jan, 2017

Learn how we can help with your project...

Request Consultation