We were asked to convert a stock room into a CBCT room, with very short notice, for a new Vatech Green machine that was being installed.
We were able to start the project within a few days and carry out a turnkey solution to prepare the room. This included strip-out, lead lining, adapting and tidying up electrical and plumbing services, new lead door, decorating and flooring.
Posted by Eclipse Admin
10 Aug, 2021
Tagged