Complete refurbishment of a three surgery dental department. The PCT wanted to reduce to two surgeries whilst complying with the latest regulations.
Eclipse worked closely with the Primary Care Trust’s architect carrying out site surveys to produce a spatial design which really worked.
It was found that the larger surgery still didn’t offer the space required to work ergonomically with more than one position, so a 3 in 1 concept was developed as a solution. This included a stand-alone chair on a mobile base that could safely be moved out of the working position and the introduction of a mobile wheelchair recliner. This had a special bariatric seat attachment which had been tested to 375 Kg (59 Stone) providing an effective, economic solution to the provision of special needs facilities.